Code freeze

Author:Benson
Discount codesAlso: change freeze,peak freeze,Black Friday code freeze,BFCM freeze
Jump to a section

In short

A period before and during peak season when a team stops changing its site, so nothing new breaks while traffic and revenue are highest.

What it means

A code freeze is a window in which no theme edits, new apps or tag changes go live, usually set to cover Black Friday, Cyber Monday and the holidays. Teams freeze because changes cause most outages. Google's site reliability team found that roughly 70% of its outages came from changes to a live system.[Google, Apr 2016] (opens the source) Freezes differ. Some teams freeze everything, including app installs; others allow configuration changes in tools already live, with sign-off.

On your store

Your developer announces that nothing ships from mid-November until January. The code clean-up and extension rules you planned for Black Friday now have to be live before that date.

Why it matters

Anything you want in place for peak, from ending old codes to extension rules, has to be decided and shipped before the freeze, which moves the real deadline into October.

Sources

  1. 1Google, “Site Reliability Engineering: Introduction”, Apr 2016. sre.google (opens the source)

Find out what's leaking. Free forever, no card.

Free forever up to 25,000 sessions a month. Every Pro feature free for your first 14 days. No card. We'll email you about getting started. Unsubscribe any time.